Construction Tool

LTC Calculator

Loan-to-cost (LTC) is the loan divided by the total project cost — land, hard costs and soft costs. Enter your budget to see your LTC, the most a lender's LTC limit allows you to borrow, and the equity you need to bring.

  • 65–80% LTCTypical Construction Max
  • Loan ÷ CostLTC Formula
  • Dev/RenoUse Case

LTC Calculator

Example values are filled in — replace them with your own.

Loan-to-Cost Ratio
—
—
Total Project Cost
—
Max Loan at Target LTC
—
Required Equity
—
Equity Gap / Surplus
—
Apply with these numbers

Need construction or value-add financing? Our advisors connect you with construction lenders, bridge lenders, and SBA options.

Understanding Loan-to-Cost

LTC is the key leverage metric for development and renovation projects.

LTC vs LTV

LTV uses the appraised (completed) value. LTC uses the total project cost (land + construction + soft costs). For new construction, there is no existing value to appraise — so LTC is the primary metric. After completion, lenders switch to LTV for permanent financing.

What Counts as Total Cost?

Total project cost includes: land acquisition, hard costs (construction, materials, labor), soft costs (architecture, engineering, permits, legal), interest reserves, contingency reserves, and developer fees. Lenders may exclude some soft costs from their LTC calculation. If you buy the land before the construction loan closes, a land loan can finance it until then.

Worked Example

Land $400,000 + hard costs $800,000 + soft costs $150,000 = $1,350,000 total cost. A $950,000 loan request is 70.4% LTC. At a 75% LTC limit the most a lender would lend is $1,012,500, so you need $337,500 of equity (25% of cost) and the request has $62,500 of room. At SBA 504's 90% the maximum is $1,215,000 and equity $135,000. These are this calculator's example inputs, for illustration only.

Construction Loan LTC Limits

Ground-up construction loans: 65–80% LTC — banks and portfolio lenders 70–80%, private lenders 65–75%. Renovation (fix-and-flip) loans: 80–90% LTC, usually also capped at a share of after-repair value. Bridge loans are usually quoted as LTV: 65–80% of value or cost. SBA 504 (owner-occupied new construction): up to 90% of project cost — 85% for a business two years old or less or a special-purpose building, 80% if both. Higher leverage means less equity but usually a higher rate.

LTC with Mezzanine / Preferred Equity

To exceed standard LTC limits, developers use mezzanine debt or preferred equity to fill the gap between senior debt and their own equity. A project might have 65% LTC senior debt + 15% mezzanine = 80% combined leverage, requiring only 20% sponsor equity.

Max LTC by Financing Type

Different lenders and programs allow different leverage on project costs. Construction ranges match our construction loan page; bridge loans are usually quoted on value (LTV).

Financing TypeMax LTCTypical UseEquity Required
Construction Loan (Bank)70–80%Ground-up development20–30%
Private / Bridge Construction65–75%Speed, non-bankable projects25–35%
Fix-and-Flip / Renovation80–90% LTCValue-add, repositioning10–20%
SBA 504 (New Construction)Up to 90%Owner-occupied new build10–20%
Mezzanine + Senior75–90% combinedLarger projects $5M+10–25%

Frequently Asked Questions

Common questions about LTC and construction financing.

How do you calculate loan-to-cost?

Divide the loan amount by the total project cost (land + hard costs + soft costs) and multiply by 100. Example: a $950,000 loan on a $1,350,000 project ($400,000 land, $800,000 hard costs, $150,000 soft costs) is 70.4% LTC. At a 75% LTC limit the maximum loan is $1,012,500 and you bring $337,500 in equity.

What is the difference between LTC and LTV?

LTC (Loan-to-Cost) divides the loan by total project cost. LTV (Loan-to-Value) divides the loan by the appraised value after completion. For new construction, LTC is primary since there's no existing building to appraise. After stabilization, lenders switch to LTV for permanent financing.

What is included in total project cost?

Total project cost = Land + Hard Costs (construction, materials, labor) + Soft Costs (permits, design, legal, interest reserves, contingency). Some lenders exclude certain soft costs. Ask your lender exactly what they include in their LTC calculation.

What LTC can I get for a construction loan?

Construction loans run 65–80% LTC: banks and portfolio lenders 70–80%, private lenders 65–75%. Fix-and-flip renovation loans: 80–90% LTC. SBA 504 for owner-occupied new construction: up to 90% (85% for a new business or special-purpose building, 80% if both). Higher LTC requires stronger sponsorship, pre-leasing, and sometimes personal guarantees.

Can I get 100% financing for construction?

Not from a single source, but you can layer capital. Example: 65% senior construction loan + 20% mezzanine debt + 15% preferred equity = 100% of costs financed. However, the total cost of capital will be higher, and you'll have less control.

How do I qualify for a construction loan?

Lenders evaluate: sponsorship experience (track record of similar projects), equity contribution, pre-leasing or pre-sales, project feasibility, market conditions, and personal net worth. First-time developers typically need more equity and may benefit from SBA programs.

How does BestLoanUSA help with construction financing?

We connect you with construction lenders, bridge lenders, and SBA programs that match your project type and experience level. We help prepare lender-ready project budgets and proformas. Our advisory is free — we are compensated by the lender at closing.

Build It. Finance It. Profit.

Our advisors structure construction and value-add financing to maximize your leverage while meeting lender requirements.

Get Construction Financing